You need to submit a grid connection application to the local power grid company, providing materials such as ID card, house property certificate, and PV system plan. After the power grid company approves, you can install the system, and it will be connected to the grid after acceptance.
Introduction
Timeline
How to Participate
Participate in one or both!
We invite you to share your story with Sigenergy and inspire others on their journey toward smart and sustainable energy. Stories may be submitted in any language and should include photos or videos. To ensure clarity, entries are categorized into three themes.
For each category, the most authentic and inspiring stories will be recognized with special awards and prizes, and will be featured on Sigenergy's official channels.
Include system configuration, battery capacity, and key usage scenarios, together with supporting visuals (e.g., monthly bills or screenshots).
We welcome stories that reflect meaningful experiences, personal insights, or moments of connection.
Awards & Prizes
| Rank | Prize |
|---|---|
| Champion | Sigen Battery 10.0 |
| Runner-up | Sigen EVDC Charging Module |
| Third Place | Sigen EV AC |
Prize : A Shanghai Experience Trip (value up to USD 5,000 ).
Prizes: 5,000 points, redeemable at Sigenergy Mall.
FAQS
-
What procedures are required for residential PV installation?
-
What are the core components of a distributed PV system?
You need to submit a grid connection application to the local power grid company, providing materials such as ID card, house property certificate, and PV system plan. After the power grid company approves, you can install the system, and it will be connected to the grid after acceptance.
-
What factors affect the power generation of a residential PV system?
You need to submit a grid connection application to the local power grid company, providing materials such as ID card, house property certificate, and PV system plan. After the power grid company approves, you can install the system, and it will be connected to the grid after acceptance.
-
What is the service life of solar PV modules?
You need to submit a grid connection application to the local power grid company, providing materials such as ID card, house property certificate, and PV system plan. After the power grid company approves, you can install the system, and it will be connected to the grid after acceptance.